Work on the second floor of the Anamaduwa building continues to move forward steadily. The team reached a significant milestone with the installation of the structural elements and is now focused their work towards the https://phoenixyvco187976.mpeblog.com/65945817/finalization-of-second-floor-at-anamaduwa-building